Corpus Christi Harbor Bridge
Flatiron/Dragados joint venture for the Texas Department of Transportation. The longest cable-stayed bridge in the United States, with a 1,661-foot main span and 538-foot towers — the tallest structure in South Texas. Opened 2025.
Tahoe served as a primary hauler for all disposed and imported materials.

