Projects

Work that outlasts us.

“What gives me excitement is to build projects that are generational — that the city will be using for generations to come. I know that my daughter, their kids are also going to see and use these same facilities.”
Mark Davis
the completed structure at distance, in its setting. No people, no equipment, no client branding.
Reference comp — photography pending, content pack TSS-1

Corpus Christi Harbor Bridge

Flatiron/Dragados joint venture for the Texas Department of Transportation. The longest cable-stayed bridge in the United States, with a 1,661-foot main span and 538-foot towers — the tallest structure in South Texas. Opened 2025.

Tahoe served as a primary hauler for all disposed and imported materials.

Cheniere Corpus Christi Liquefaction

LNG export terminal on the La Quinta Ship Channel, roughly 20 miles from our yard.

Tahoe’s scope on the project included

  • Site grading
  • Guardrail installation and fabrication
  • Utility installation and removal
  • Materials procurement
  • Road building, pad sites, and ground construction
  • Equipment and operators
  • General site maintenance
  • Site and project management

This is the project that led us to form Tahoe Services & Solutions, after a Cheniere vice president pointed out that the work in front of us was bigger than the name on our trucks.

material being separated or stockpiled inside the fenced site; or utility/guardrail work in progress. Working light, mid-shift.
Reference comp — photography pending, content pack TSS-1

Home Depot

The last gap in the proof layer. Rendered as a visible hold rather than omitted, so the gap stays countable.

location, year and scope required from Mark